Construction Programmer

Full Time Role
Brisbane
Posted 2 years ago

Looking for a challenge and a change of scene?

If you are an enthusiastic, ambitious team player with an ability to think logically and strategically with excellent communication skills, then this could be the role you have been looking for.

We have:

An opening for a construction programmer with a minimum five years post grad experience to join our specialist programming, delay claim analysis team working for one of the most highly regarded international construction cost, program and advisory consultancies in Brisbane.

Exposure to all industry sectors, on high profile projects in Brisbane and Australia, including Queens Wharf, Inland Rail, Cross River Rail and Brisbane Airport.

Reporting directly to the programming director, this role will provide you with a unique opportunity to receive valuable mentoring, gain diverse project experience, as well as expand and develop your knowledge base.

The role of the programmer is to manage all time related aspects of a construction project, commencing from feasibility and/or design, all the way through to practical completion.

You have:

  • Australian residency, and eligible to work in Australia
  • A degree qualification in Construction Management (preferred)
  • Experience using Primavera P6, Microsoft Project or Powerproject
  • Experience using Microsoft Office applications including Word and Excel
  • Previous Australian construction industry experience (advantageous)
  • Exceptional communication skills, both written and verbal
  • The ability to prioritise and multi task effectively
  • The ability to work well as part of a team
  • Full Australian driving licence

If you’re seeking a change in direction and looking for a new challenge in 2022, we would love to talk to you.

Job Features

Job CategoryTechnical

Apply Online

A valid email address is required.
A valid phone number is required.