RLB CRANE INDEX®
Auckland’s RLB Crane Index® fell marginally from 179 to 176 points in Q1 2026. The city now hosts 58 long-term cranes, down from 59 in the previous edition, with 26 cranes added and 27 removed.
Q1 2026
Highlights
Crane numbers suggest Auckland remains near the bottom of the cycle, with activity concentrated in infrastructure-led work and selective residential developments rather than a broad-based recovery.
Currently, there are 17 residential long-term cranes, the same as in Q3 2025. Six new cranes commenced on residential projects in this edition, offset by six removals. The proportion of residential cranes remained steady at around 29% of all long-term cranes, well down from 40 to 60% over the 2016 to 2022 period.
Residential long-term crane numbers in Auckland remained steady, supported by a continued development pipeline from developers such as Simplicity Living, which added two new tower cranes to its latest Morningside project.
Consistent with the previous quarter, Tier 2 contractors Kalmar and CMP continue to lead the Auckland crane count, while many Tier 1 contractors maintain historically low levels of crane activity.
The total value of building work put in place in 2025 in Auckland was down 8.4 per cent compared to 2024
(to $12.5 billion). The number of new Auckland building consents has risen, up 13.3 per cent in the year ended January 2026 (to 15,779 dwellings).
Current activity by sector:
- Aged Care: Metlifecare Gulf Rise; Summerset Village
- Civic: Domestic Processor -Buildings and Piers (4 cranes); Te Hono Community Centre & Library project
- Civil: Orakei Infrastructure and Pedestrian Works (5 cranes); Bledisloe wharf extension (4 cranes); Ō Mahurangi – Penlink Project (4 cranes); Glen Innes Station Pedestrian Overbridge; Rosedale Park; SH1 Papakura to Drury Motorway Upgrade; Watercare Central Interceptor (5 cranes); Watercare Mid-Town
- Commercial: Fisher and Paykel Healthcare; 35 Graham Street; Orams Marine Building and Retail
- Data Centres / Industrial: Puhinui Road, Wiri
- Education: Carlaw Park Student Village (2 cranes)
- Health: Allevia Health – Urology Institute; Kakariki Stage 2 Development; MPI; Middlemore Hospital.
- Hotel: DoubleTree Hilton; Moxy Hotel
- Residential: Simplicity Living, Ascot Avenue, (2 cranes); Simplicity Living Morningside (2 cranes); 87 Shelly Beach Road, Saint Mary’s Bay; Chelsea Rise Apartments; Elysian Apartments; Kensington Park; Orakei Residential House; Ockham “Station M”; Pompallier on Ponsonby; 819 Riddell Road, St Heliers; Seascape Custom Street Residential; Sero Apartments; The Domain Collection; The Hill; York House
Cranes were removed from:
- Aged Care: Huapai Country Club; Metlifecare Fairway Gardens; Parkside Village – Metlifecare; Summerset Village; The Foundation Village Stage 2
- Civil: Watercare Central Interceptor (7 cranes); Central Plant & Tunnel Auckland Hospital
- Commercial: Fisher & Paykel Appliances HQ (2 cranes); Fisher and Paykel Healthcare
- Data Centres / Industrial: HV2 CDC Data Centre (3 cranes); Hobsonville Road
- Residential: The Viridian (2 cranes); 161 Hendon Avenue, Mount Roskill; Fabric 2 Apartments; Fiore 5; Reiputa – Simplicity Living
Q1 2026
Summary
| Region | Change | |
|---|---|---|
| AUCKLAND | -1 | |
| Sector | Change | |
|---|---|---|
| AGED CARE | -5 | |
| CIVIC | 1 | |
| CIVIL | 4 | |
| COMMERCIAL | -2 | |
| DATA CENTRES | -3 | |
| EDUCATION | 2 | |
| HEALTH | 2 | |
| HOTEL | 0 | |
| MIXED USE | N/A | |
| RECREATION | N/A | |
| RESIDENTIAL | 0 | |
| RETAIL | N/A | |
Q1 2026
Crane Activity
By Region
OPENING / CLOSING COUNT COMPARISON
| OPENING COUNT | MOVEMENT | CLOSING COUNT | |||||
|---|---|---|---|---|---|---|---|
| Q3 2025 | % | NET | Q1 2026 | % | |||
| AUCKLAND | 59 | 50.9% | 26 | -27 | -1 | 58 | 56.9% |
By Sector
OPENING / CLOSING COUNT COMPARISON
| OPENING COUNT | MOVEMENT | CLOSING COUNT | |||||
|---|---|---|---|---|---|---|---|
| Q3 2025 | % | NET | Q1 2026 | % | |||
| AGED CARE | 7 | 11.9% | 0 | -5 | -5 | 2 | 3.4% |
| CIVIC | 4 | 6.8% | 1 | 0 | 1 | 5 | 8.6% |
| CIVIL | 18 | 30.5% | 13 | -9 | 4 | 22 | 37.9% |
| COMMERCIAL | 5 | 8.5% | 1 | -3 | -2 | 3 | 5.2% |
| DATA CENTRES | 4 | 6.8% | 1 | -4 | -3 | 1 | 1.7% |
| EDUCATION | 0 | 0.0% | 2 | 0 | 2 | 2 | 3.4% |
| HEALTH | 2 | 3.4% | 2 | 0 | 2 | 4 | 6.9% |
| HOTEL | 2 | 3.4% | 0 | 0 | 0 | 2 | 3.4% |
| MIXED USE | 0 | 0.0% | 0 | 0 | 0 | 0 | 0.0% |
| RECREATION | 0 | 0.0% | 0 | 0 | 0 | 0 | 0.0% |
| RESIDENTIAL | 17 | 28.8% | 6 | -6 | 0 | 17 | 29.3% |
| RETAIL | 0 | 0.0% | 0 | 0 | 0 | 0 | 0.0% |
| TOTAL | 59 | 50.9% | 26 | -27 | -1 | 58 | 56.9% |
RLB CRANE INDEX®
PREVIOUS EDITIONS
-
Crane Index
RLB Crane Index® New Zealand Q3 2025
The number of long-term cranes across New Zealand’s main centres increased from 105 in Q1 2025 to ...
Read -
Crane Index
RLB Crane Index® New Zealand Q1 2025
The New Zealand construction industry is currently facing significant challenges, reflecting broader...
Read -
Crane Index
RLB Crane Index® New Zealand Q3 2024
Gross Domestic Product (GDP) data for the March 2024 quarter revealed a modest increase of 0.2% in ...
Read -
Crane Index
New Zealand Q1 2024 Crane Index
While the overall value of building activity and consents are at (or near) record highs, New ...
Read