Construction Programmer wanted!

Full Time Role
Brisbane
Posted 6 months ago

Would you like to work for one of the most highly regarded international construction cost, program and advisory consultancies in Brisbane?

Providing valued services to all industry sectors, on some of the most high-profile projects in Brisbane and Australia?

If you’re seeking a change in direction and looking for a new challenge in 2023, we would love to talk to you.

We are looking for:

We are looking for a construction programmer with a minimum 5 years post grad experience to join our specialist programming, delay claim analysis team based in our Brisbane office.

Reporting directly to the programming director, this role will provide you with a unique opportunity to receive valuable mentoring, gain diverse project experience, as well as expand and develop your knowledge base.

The role of the programmer is to manage all time related aspects of a construction project, commencing from feasibility and/or design, all the way through to practical completion.

If you are an enthusiastic, ambitious team player with an ability to think logically and strategically with excellent communication skills, then this could be the role you have been looking for.

Position requirements include:

  • Australian Citizen or Permanent resident
  • Degree or higher qualification in Construction Management is preferred
  • Experience using Primavera P6, Microsoft Project or Powerproject
  • Experience using Microsoft Office applications including Word and Excel
  • Previous Australian construction industry experience would be an advantage
  • Ability to communicate effectively (written and oral)
  • Ability to prioritise and multitask effectively
  • Ability to work well as part of a team
  • Full Australian driving licence

If you’re seeking a change in direction and looking for a new challenge in 2023, we would love to talk to you.

Job Features

Job CategoryTechnical

Apply Online

A valid email address is required.
A valid phone number is required.