KAI TAK SPORTS PARK
Kai Tak Sports Park in Hong Kong is the largest sports and entertainment complex ever built in the region. RLB’s consultants played a pivotal role in overcoming the formidable challenges of its construction by applying their expertise in cost management, value engineering and strategic procurement.
The 50,000-seat main stadium, which is made of 15,000 tonnes of steel, is the architectural centrepiece of Kai Tak Sports Park. It has a striking façade composed of tens of thousands of aluminium panels, a design inspired by Hong Kong’s historical name, ‘The Pearl of the Orient’.
Other amenities at the complex include a 10,000-seat indoor sports arena, a 5,000-seat public sports ground, a mall with retail and dining outlets, outdoor sports courts, and landscaped open spaces dedicated to community use.
At a glance
-
ClientCulture, Sports and Tourism Bureau, Government of the Hong Kong Special Administrative Region
-
ServicesCost Management & Quantity Surveying, Cost Benchmarking, Value Engineering, Procurement Strategies
-
sectorSport, Public & Civic
-
LocationHong Kong, China
Optimum procurement model
Given the sheer scale of the project and its significant construction costs, one of our first and most important tasks was to evaluate different procurement models to determine the best one to deliver value for money, attract high-quality bid proposals and incentivise private sector investment.
The procurement approach adopted was a Design-Build-Operate model under a 25-year contract, integrating design, construction and operations within a single entity. This consolidated innovation, risk management and delivery capabilities to maximise efficiency and life cycle performance, providing the optimum balance of risk and reward between the contracting parties. Importantly, it enabled the company that would operate the complex to input into its design and advise how to make it more commercially viable.
Rigorous cost control
As the project had to be delivered within a tight budget and schedule while meeting world-class standards, RLB adopted a proactive and structured approach to cost management. Our methods focused on early identification of cost-critical issues and collaborative problem-solving with the client and design team to inform the design process and maintain rigorous cost control.
Value engineering principles
We applied value engineering principles across all design stages to compare alternatives and optimise solutions for critical structural elements, high-maintenance components and energy-intensive systems.
Design options were evaluated against criteria including life cycle costs, functionality, programme impact, aesthetics, and long-term maintenance and operational expenses. Regular workshops with the project team ensured alignment between design aspirations and cost parameters.
Embedded approach to sustainability
Sustainability principles were embedded throughout the design and construction processes. This included adopting climate-responsive infrastructure and green building best practices, for example, achieving a green ratio of over 30% with more than 1,000 trees planted to mitigate the urban heat island effect.
Through optimised design and BIM-driven efficiencies, the project saved over 1,000 tonnes of steel (approximately 6% of total tonnage). To date, the development has received multiple green building certifications – Platinum under BEAM Plus, Gold under LEED, and 3-Stars under the Hong Kong Green Label Scheme – along with a substantial collection of other environment-related awards and accolades.
-
50,000
seating capacity
-
15,000
tonnes of steel
-
1,000
trees planted
Leveraging RLB’s global network
With no comparable cost data available in Hong Kong, our team drew on the expertise of colleagues in RLB’s global network who had carried out a detailed study benchmarking the construction cost of sports stadiums around the world.
The benchmark data included key metrics such as cost per seat, cost per square metre, area per spectator seat, steel structure weight (kg/m²), and seating capacities. To adapt these metrics to the Hong Kong context, we applied relativity indices and location factors, converting historical costs into relevant local values.
This data provided a reliable baseline upon which an accurate budget estimate was established for Kai Tak Sports Park, critical to enabling better-informed planning decisions and ensuring the cost-effectiveness of the stadium design, as well as delivering a substantial increase in cost certainty for our client.